Skip to content

Conversation

@ti-chi-bot
Copy link
Member

This is an automated cherry-pick of #63211

What problem does this PR solve?

Issue Number: close #62937

Problem Summary: For plan like the following, optimizer do decorrelate, it pulled up projection. But actually it shouldn't. Because the Apply is a LeftOuterJoin, and the projection, which is the right side of LeftOuterJoin, should output null when join condition is not matched. But this semantics will not be respected when the projection was pulled up. That's why we got wrong result.

TiDB [email protected]:test> explain SELECT (SELECT /*+ no_decorrelate()*/ IF(substr(dd.segment1,1,3)='600','X','') FROM dual WHERE dd.amount<>0) c1,dd.amount,dd.segment1 FROM test.hcst_test_sel_dual dd;
+---------------------------+---------+-----------+---------------+----------------------------------------------------------------------------+
| id                        | estRows | task      | access object | operator info                                                              |
+---------------------------+---------+-----------+---------------+----------------------------------------------------------------------------+
| Projection_9              | 3.00    | root      |               | Column#4, test.hcst_test_sel_dual.amount, test.hcst_test_sel_dual.segment1 |
| └─Apply_12                | 3.00    | root      |               | CARTESIAN left outer join, left side:TableReader_14                        |
|   ├─TableReader_14(Build) | 3.00    | root      |               | data:TableFullScan_13                                                      |
|   │ └─TableFullScan_13    | 3.00    | cop[tikv] | table:dd      | keep order:false, stats:pseudo                                             |
|   └─MaxOneRow_15(Probe)   | 3.00    | root      |               |                                                                            |
|     └─Projection_16       | 2.40    | root      |               | if(eq(substr(test.hcst_test_sel_dual.segment1, 1, 3), 600), X, )->Column#4 |
|       └─Selection_18      | 2.40    | root      |               | ne(test.hcst_test_sel_dual.amount, 0)                                      |
|         └─TableDual_20    | 3.00    | root      |               | rows:1                                                                     |
+---------------------------+---------+-----------+---------------+----------------------------------------------------------------------------+

What changed and how does it work?

Add a new function to check whether to do decorrelate for LeftOuterJoin. The basic idea is: if the expressions of projection are all from the outerPlan, it means the projection will not respect the semantics of LeftOuterJoin in most cases(unless the outerPlan output null row, and the expression is not null-rejective, this expression will also output null).
So when that happens, will not do decorrelate.

TODO:

  1. The check in this PR is very conservative, it barely affects plan changes because it only blocks plans that are guaranteed to be wrong.
  2. But from another perspective, this PR doesn’t fully solve the problem. For instance, we could block decorrelation when a projection expression involves inner plan columns and the expression is null-rejective. But our implementation of null-reject is buggy, so relying on it could cause new issues — that’s why I didn’t go down that path.

Check List

Tests

  • Unit test
  • Integration test
  • Manual test (add detailed scripts or steps below)
  • No need to test
    • I checked and no code files have been changed.

Side effects

  • Performance regression: Consumes more CPU
  • Performance regression: Consumes more Memory
  • Breaking backward compatibility

Documentation

  • Affects user behaviors
  • Contains syntax changes
  • Contains variable changes
  • Contains experimental features
  • Changes MySQL compatibility

Release note

Please refer to Release Notes Language Style Guide to write a quality release note.

None

@ti-chi-bot ti-chi-bot added do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR. labels Dec 1, 2025
@ti-chi-bot
Copy link
Member Author

@guo-shaoge This PR has conflicts, I have hold it.
Please resolve them or ask others to resolve them, then comment /unhold to remove the hold label.

@ti-chi-bot
Copy link

ti-chi-bot bot commented Dec 1, 2025

@ti-chi-bot: ## If you want to know how to resolve it, please read the guide in TiDB Dev Guide.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the ti-community-infra/tichi repository.

@ti-chi-bot
Copy link

ti-chi-bot bot commented Dec 1, 2025

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign fixdb for approval. For more information see the Code Review Process.
Please ensure that each of them provides their approval before proceeding.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@codecov
Copy link

codecov bot commented Dec 1, 2025

Codecov Report

✅ All modified and coverable lines are covered by tests.
⚠️ Please upload report for BASE (release-8.5@07dd0cb). Learn more about missing BASE report.

Additional details and impacted files
@@               Coverage Diff                @@
##             release-8.5     #64785   +/-   ##
================================================
  Coverage               ?   74.2522%           
================================================
  Files                  ?       1652           
  Lines                  ?     455792           
  Branches               ?          0           
================================================
  Hits                   ?     338436           
  Misses                 ?      95046           
  Partials               ?      22310           
Flag Coverage Δ
integration 28.7386% <0.0000%> (?)
unit 72.7160% <100.0000%> (?)

Flags with carried forward coverage won't be shown. Click here to find out more.

Components Coverage Δ
dumpling 52.9278% <0.0000%> (?)
parser ∅ <0.0000%> (?)
br 52.6559% <0.0000%> (?)
🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.
  • 📦 JS Bundle Analysis: Save yourself from yourself by tracking and limiting bundle sizes in JS merges.

@ti-chi-bot
Copy link

ti-chi-bot bot commented Dec 1, 2025

@ti-chi-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
idc-jenkins-ci-tidb/check_dev 5eefff0 link true /test check-dev
idc-jenkins-ci-tidb/mysql-test 5eefff0 link true /test mysql-test
idc-jenkins-ci-tidb/check_dev_2 5eefff0 link true /test check-dev2

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@ti-chi-bot ti-chi-bot bot added cherry-pick-approved Cherry pick PR approved by release team. and removed do-not-merge/cherry-pick-not-approved labels Dec 2, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

cherry-pick-approved Cherry pick PR approved by release team. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. sig/planner SIG: Planner size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-8.5 This PR is cherry-picked to release-8.5 from a source PR.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants